Programmable Internetworking & Communication Operating System Docs ... Click Spaces -> Space Directory to see docs for all releases ...
Page tree
Skip to end of metadata
Go to start of metadata

For proper and safe operation, the following conditions must be met prior to installation:

  • Confirm that the cabinet itself has a good ventilation and cooling system.
  • Confirm that the cabinet is strong enough to support the switches.
  • Confirm that the cabinet is well grounded.
  • To guarantee normal operation and service life of the switch, a stable temperature and humidity in the equipment room must be maintained.
  • Keep the switch clean and maintain normal anti-interference standards.
  • No labels